Press About Us

Coal Company Zarechnaya supports Christmas arrangement in Polisaevo

Due to the agreement with local government of Polysaevo Coal Company Zarechnaya has donated 400 thsnd roubles for Christmas decoration of the city.

The second stage of Baltic Coal Terminal

http://portnews.ru/news/65532/

Increasing the freight turnover

http://portnews.ru/news/65533/

Все публикации...

News of DIA «Kuzbass»

RSS

04.05.2012

On the Victory Day

Yurga Engineering Plant is preparing to celebrate the most important holiday of the country — the Victory Day.

02.05.2012

The contest for the Plant’s inventors and innovators

Yurga Engineering plant has announced the contest «Innovations and inventions-2012». This year the contest of the company’s innovators and inventors is devoted to the 70th anniversary of the Plant.

02.05.2012

All drivers of Yurga Engineering Plant will take part in the competition

Before the 70th anniversary of the motor-road transport department the management of Yurga Engineering Plant announced the competition for the best motor vehicle.

28.04.2012

Batch production

Yurga Engineering Plant has started batch production of mast hoists for the direct communications module. The first hoist which was produced under the government contract has passed the acceptance test.

26.04.2012

A practical lesson

Teachers of Yurga Training college 55 for the time held a practical lesson for the future turners in the shop floor of their social partner — Yurga Engineering Plant.

20.04.2012

Sport contest of the company’s designers

The staff of the specialist design department of Yurga Engineering Plant is preparing for its anniversary.

18.04.2012

Time to sum up the results

The traditional winter sports championship of Yurga Engineering plant has finished. This year 10 teams participated in the contest. 34 medals were played during five months.

16.04.2012

On a holy day

Over three thousand children from Yurga received presents from Yurga Engineering Plant and Charity fund «Zarechye» on Easter Eve.

11.04.2012

A new generation machine

A new generation shearer K750Yu which knows no equals in Russia due to its unique technical characteristics will be shown by Yurga Engineering Plant this year at the International exhibition forum «Russian Coal and Mining».

11.04.2012

Production of weight lifting equipment at Yurga Engineering Plant

The producers of the weight lifting equipment from Yurga Engineering Plant are preparing to dispatch the drilling rigs which they produce in cooperation with the American firm «Atlas Copco» and «Automobile plant «URAL».

11.04.2012

Zarechnaya results for the 1st quarter of 2012

Mines of Coal company Zarechnaya produced 2.338 mln. tons of coal within 3 months of the current year. The holding company’s tunnellers have prepared 10 540 meters of mines.

06.04.2012

Charity Marathon

Coal company Zarechnaya provided help to families in need in Polysaevo within the framework of a Charity Marathon.

30.03.2012

According to the program of technical re-equipment

The specialists of Yurga Engineering Plant will master new gear-grinding equipment in Germany: purchasing modern machines including the ones of this kind is part of technical re-equipment program of the company in 2012.

28.03.2012

“Compass 3D” – for the trainees

Yurga engineers will train students to complete virtual design of their production models.

27.03.2012

The collective agreement of Yurga Engineering Plant has been declared one of the best

The Chairman of the trade committee of Yurga Engineering plant took part in the extended plenary meeting of the Central Committee of the Trade Union of general engineering workers of the Russian Federation devoted to the 35th anniversary of the Trade Union.

22.03.2012

Mine Zarechnaya starts production on new longwall face

Mine Zarechnaya (Coal Company Zarechnaya) starts the production on new longwall face 1102of the Nadbaikaimsky layer. The capacity of the longwall face amounts to 920 thsnd. tons of coal.

11.03.2012

A committee will oversee preparation activities for the heat deficit period

Yurga Engineering Plant has formed a committee to control the preparation activities of the plant’s subdivisions for the heat deficit period.

11.03.2012

Social program works

In February Administration of Yurga Engineering Plant signed a document aimed at providing aid in buying a home of their own for the plant workers.

11.03.2012

Production for the miners

Yurga engineers completed producing mining equipment for Donetsk miners. This month the last set of spare tools and devices for the roof support MKYu.4U-10/20 is to be dispatched to Mine Management Office «Pokrovskoye».

07.03.2012

Wedding at the ski-track

On his wedding day Vasiliy Mishenkov, an employee of Yurga Engineering Plant, decided to put on his sport suit and take part in the plant’s winter championship — all that because he did not want to short-sell his team.